Audience: the person putting a new build onto nodes that already hold a chain.
Scope: classifying a change, rolling it out, and knowing when it stops being a rollout.
Not the first launch — that is docs/RUNBOOK_LAUNCH.md. Not an incident — that is
docs/RUNBOOK_ROLLBACK.md.
Every claim in this file is labelled. MEASURED means it was observed by running the thing
named, on the date given. REASONED means it is an argument from code that was read.
UNBUILT means the thing does not exist.
0. Read this first — thirty seconds#
Three kinds of change wear the same clothes, and only the first is an upgrade.
| Kind | What moved | What it is | Where it goes |
|---|---|---|---|
| A | Nothing a peer can see. Logging, CLI text, an operator surface, a non-consensus fix. | A rolling restart. Nodes on the old build and the new one are the same network. | §3 |
| B | The state transition: how a block changes state. Genesis hash may be unchanged. | A hard fork wearing a version number. Two builds compute two chains from the same blocks. | §5 |
| C | The genesis: chain name, allocations, declared validator set, bridge attestors. | A hard fork, and it announces itself. The genesis hash moves and the two builds cannot peer at all. | §5 |
Kind B is the dangerous one, because it looks exactly like kind A from outside.
MEASURED, 2026-09-07: a build whose state-root computation was altered by one line printed a
byte-identical genesis hash, started cleanly and reported itself healthy — and could not
apply a single block its peers produced. docs/RUNBOOK_CANARY.md §5 is that case, worked
through end to end.
So the first thing you do is classify, and the classification is not a matter of opinion: §1 gives the procedure, and it is one command.
1. Classify the change before you deploy it#
1.1 Kind C is one command#
npm run build
node dist/src/cli/strblk.js genesis --identityCompare all three lines against what the running network was launched on. MEASURED,
2026-09-07: changing the development chain's chainName — one caption, no logic — moves
genesisHash:
chainName SourceLess Development Fork
genesisHash 7f3013113e1133eb75dfa17892a263afb7e1358716e039ee444c7e51df194adbagainst a baseline of 8ee28b94…76ea. genesisHash covers the chain id, the chain name, the
allocations, the declared validator set and the bridge attestors. There is no cosmetic change
to any of them.
--identity prints two more lines, and they are the ones kind B moves. genesisStateRoot
is the ledger root at height 0 and genesisBlockHash is block zero's hash, which covers that
root plus the header framing. MEASURED, 2026-09-07, building this tree twice with one line
removed from LedgerManager.stateRoot: genesisHash was 8ee28b94… in BOTH builds, while
genesisStateRoot moved a6bf0085… → e760f04a… and genesisBlockHash moved
abaa1b65… → d61464fa…. So a kind C check that reads only genesisHash cannot see a kind
B change, and the other two lines can — at least when the change touches genesis state. Read
the whole of 1.2 before you treat them as a substitute for a canary.
scripts/canary.mjs makes the same comparison as stage 0 and refuses before it starts a node.
MEASURED, exit 1:
[HOLD] the candidate is a DIFFERENT NETWORK
...
No node was started. Nothing to roll back.If the hash moved: stop, this is §5. Do not roll it anywhere.
1.2 Kind B needs a canary, and nothing else will find it#
MEASURED, 2026-09-07: a genesisHash-only comparison passes a state-transition change.
So do typecheck and the unit suite, if the change is deliberate.
CI used to make exactly that mistake: REASONED from reading .github/workflows/ci.yml as it
stood, its determinism, container, linux-binary and windows-exe jobs all extracted
genesisHash with grep + awk and compared that one string. All four now diff the full
strblk genesis --identity output instead. That is CONFIGURATION — no job in that file has
been observed to run from this machine, gh is unauthenticated and act is absent. The step
BODY was run locally on 2026-09-07 against a canonical and a divergent build of this tree: the
old body printed one identical hash for both, the new body exited 1 naming genesisStateRoot
and genesisBlockHash.
None of that makes CI a kind-B gate. It catches a kind B change only when the change moves GENESIS state, and most do not: a change to how a transfer is applied, a fee is charged or a record is folded leaves height 0 identical and diverges at height N. Those three digests are computed over an empty chain, and an empty chain exercises almost none of the state transition.
The only thing in this repository that catches kind B is running the two builds against each
other on a live chain and comparing heads and state roots at a common height. That is
docs/RUNBOOK_CANARY.md, and §3 below is where it goes in the sequence.
A shortcut that is not a substitute. If a node data directory with a real chain is to hand, Hlin will replay it under both builds:
node scripts/rollback.mjs --dir <datadir> --to <the new dist> --from <the running dist>MEASURED, 2026-09-07, against a four-block directory with a divergent candidate:
[STOP] the target build replays this chain it could not: ...
accepted false
reason snapshot belongs to a different genesisand, on a control pair, the check that clears it:
[ok] both builds agree about this chain same genesis, same Urd proof 8234871ff522dad8935069e3…This is cheaper than a canary and weaker: it proves the new build can replay a chain, not that it can produce blocks the old build accepts. Use it as a pre-check, not as the gate.
1.3 A change to a governed parameter is not an upgrade at all#
MEASURED by reading src/governance/parameters.ts: five parameters are governable —
chain.blockTargetSeconds, chain.requiredConfirmations, governance.votingWindowMs,
governance.ordinaryTimelockMs, governance.governanceChangeTimelockMs. Changing one of those
is a governance record carried in a block and applied by every node. Do not ship a build to
change one. Everything else — the gas price, the burn interval, the collateral epoch — changes
only by shipping a build, and shipping a build that changes one of them is kind B.
2. What an upgrade physically is#
Three steps, and none of them touches chain state. That is the entire reason it is safe.
# 1. stop the node, and let it finish
kill -TERM <pid> # or: systemctl stop strblk
# 2. confirm it stopped and the directory is intact
node scripts/rollback.mjs --dir <datadir> --to <the NEW dist> --from <the OLD dist>
# 3. start the new build on the SAME data directory
strblk node --dir <datadir> --network <key> [--genesis FILE] [--peers ...]Step 2 is the rollback preflight used forwards. REASONED: Hlin's checks are symmetric —
"can that build run this chain" is the same question whichever direction you are going, and it
is the check you most want before an upgrade as well as after one.
The lock file is how step 1 is confirmed. MEASURED, 2026-09-07, on a node that did not exit
cleanly:
[STOP] the node is stopped ...\.cerberus.lock is still present. Either a node is running on
this directory, or the last one died without releasing it.and on one that did:
[ok] the node is stopped no lock file, so nothing is holding this directoryidentity.json is not replaceable and an upgrade must not touch it. It is who this node
is. Losing it does not roll a node back; it creates a new one, with a new address, that is not
the validator anybody seated.
3. The sequence for a rolling upgrade#
U1 — Gate the candidate#
npm run typecheck
npm test
npm run citationsMEASURED, 2026-09-08: typecheck exit 0; npm test exit 0 (2509 passed across 129 files,
~3–4 min); npm run citations exit 0 (245 symbol citations checked, 230 landed within 25
lines, 15 unscored for want of a definition, 0 misplaced). Add npm run deps and
npm run agents:check — both exit 0, both about a second — if you want everything CI would run
that can be run here.
Run them on the tree in front of you, not on yesterday's memory. MEASURED: earlier the same
afternoon, on this same branch, npm test was exit 1 and npm run citations was exit 1, from
work in flight in src/core/. A candidate whose gates are red is not a candidate, and a
candidate whose gates you have not run today has no known state.
U2 — Classify it#
§1. One command for kind C, and a decision about whether the change can touch the state transition. If in doubt, treat it as kind B: the cost of an unnecessary canary is ninety seconds.
U3 — Control the canary#
npm run canary # same dist both sides; must PROCEEDMEASURED, 2026-09-07: exit 0, PROCEED, ~90 s. REASONED: a gate that cannot pass when nothing
changed is a gate nobody will believe when something does.
U4 — Canary the candidate#
node scripts/canary.mjs --baseline ./dist-current --candidate ./dist-new \
--nodes 4 --canaries 1 --window 20Read docs/RUNBOOK_CANARY.md §4 for the eight checks and §5 for what a real divergence looks
like. Exit 0 is PROCEED. Exit 1 is HOLD and the cohort has already been rolled back. Exit 2
is not a verdict.
Do not proceed on [????]. An unevaluated blocking check means the gate was shown nothing.
U5 — Roll one host#
Section 2, on one host. Then watch, for longer than feels necessary:
strblk status --dir <datadir>
curl -s http://127.0.0.1:8081/api/statusFive fields, in this order. MEASURED, 2026-09-07 against a running node:
read fromnames an endpoint, not a directory. A directory means the node did not start.heightrising over ~30 seconds.finality linerising too. A height that climbs while the line does not is a node accepting blocks it is not settling.peer sessions> 0.needs a personfalse, andescalatedFaultsempty.
The one signature to know. MEASURED, 2026-09-07, the exact fault a divergent build raised
about itself:
sync-stalled: this node searched every peer ahead of it and found no common ancestor within
the finality window; rejoining is not something it can decide for itselfA node that stops advancing after an upgrade is a consensus failure until proven otherwise. Roll it back — §4 — and go back to §1.
U6 — Roll the rest, one at a time#
There is no orchestrator. MEASURED by reading the tree: no fleet inventory, no deployment
agent, no per-host version state. "Roll the fleet" means "do §2 on each host, one at a time",
and U5's five fields on each one before moving to the next.
A gap that bites exactly here. Nothing watches a production node and acts. /api/status
carries every field the canary gates on, and there is no watcher. During a rolling upgrade,
the monitoring is a person with a terminal.
4. When it goes wrong: how the canary and the rollback fit together#
They are the same procedure at two scales, and the canary is a rehearsal of the rollback.
Vidar (scripts/canary.mjs) | Hlin (scripts/rollback.mjs) | docs/RUNBOOK_ROLLBACK.md | |
|---|---|---|---|
| When | before the fleet | before touching a node | during an incident |
| Decides | proceed or hold | cleared or refused | what a person does |
| Acts | yes — rolls its own cohort back | no. It clears; you act | you act |
| Scope | a cohort it created | one directory | one node you are logged into |
MEASURED, 2026-09-07, from the canary's HOLD path — this is the rollback runbook's §4 executed
by machine:
7. Verdict: HOLD — rolling the canary cohort back
This is docs/RUNBOOK_ROLLBACK.md section 4, executed: stop the node, put the
previous build back, start it on the SAME data directory. Chain state is not
touched, because chain state is not what changed.
node4 back on baseline
rolled back 1/1
rejoined the network yes — one head across the whole cohortRolling an upgrade back is the same three steps as rolling it forward, with the old dist in
place of the new one. Chain state is not touched by either direction, which is why both are safe.
What is never safe, in either direction: rewinding chain state at or below the depth line.
A validator that rewinds past a block it has gossiped and re-seals at that height has provably
equivocated, Nidingr takes its seat, and no later agreement undoes it.
docs/RUNBOOK_ROLLBACK.md §6 is the only place that decision belongs.
5. What makes an upgrade a hard fork#
Two things, and they fail in opposite ways.
5.1 The genesis moved (kind C) — a clean partition#
The upgraded node and its peers cannot agree they are on the same chain, so they do not peer at
all. MEASURED: the canary refuses at stage 0 and starts nothing. REASONED: this failure is
loud and immediate, which makes it the safer of the two.
5.2 The state transition moved (kind B) — a silent partition#
The two builds agree on the genesis and disagree about every block after the one where they
diverge. MEASURED, 2026-09-07: the diverged node reported chainValid: true — its own chain is
internally consistent — while being unable to find a common ancestor with any peer. A node can
be perfectly valid and on the wrong chain, and it will tell you it is fine.
5.3 A consensus change is scheduled by vote, and is no longer a flag day#
MEASURED, 2026-09-07, and now WRONG — kept here because how it went wrong is the useful
part. It read: "there is no activation height, no protocol version gate, no 'this rule applies
from block N' mechanism anywhere in src/, spec/ or consensus/." That was true when a tree
search was run, and a measurement whose method is "I searched and found nothing" is the kind that
rots the moment somebody adds the thing. Nothing re-ran it.
MEASURED, 2026-09-18: src/core/logretta.ts is that mechanism. It carries rule versions,
a per-realm activation schedule, consensusRulesAtHeight, and a named refusal — never a
fallback — when a node meets a version it cannot implement. Three versions are declared; the
realms differ on purpose, and src/core/snotra.ts holds each one's schedule.
(forkHeight in src/core/blockchain.ts is still fork choice — where two chains diverged —
not fork scheduling.)
BUILT, 2026-09-23: the schedule is chain state and governance appends to it. Until this
date the schedule arrived once when a node was constructed and was fixed for the life of the
process, so giving a rule a height still meant every operator restarting on a new build inside a
window agreed somewhere off the chain. That is workable across a fleet you own. Across a public
network whose operators you have never met it is not, because the ones who miss the window do not
fork onto a minority chain — they stop validating.
A schedule-rules governance action appends {version, activationHeight} to
LogrettaSchedule, a register on LedgerManager that folds into the state root. Four properties
make that safe, and each has a test that breaks it
(tests/integration/rule-schedule.integration.test.ts):
| It carries its own height | Voted, in a block every node replays. Nothing changes without a height |
| It must clear a minimum lead | 1,325 blocks, logretta.minRuleActivationLead — about 66 minutes at the 3 s target, about 22 hours at Asgard's ~60 s cadence. A node syncing from behind meets the record long before the height it names. This is the floor the chain enforces; the 28,800-block consensus.ruleActivationMinLeadBlocks Logberg also states is not enforced on this path (HARD_FORKS_AND_UPGRADES.md §3.2) |
| Append-only and ascending | A height or version at or below one already scheduled is refused, so nothing re-judges a sealed block |
| Consensus state | Folded into the state root, absent while nothing is scheduled. Two nodes cannot hold different schedules and both report a valid chain |
strblk wallet propose schedule-rules <version> <activationHeight>Then the ordinary governance path: a vote (seven days by default), then the thirty-day
governance-change timelock, then execute. The activation lands in the register at the enacting height plus one and the
rules change at the height it names — which is a much later number, and the two are separate
fields so they cannot be confused.
What still needs every operator to act, and what happens if one does not. The vote schedules the switch; it does not install the build. An operator who has not upgraded by the activation height meets a rule version their binary does not implement and stops with a named refusal rather than computing a quiet fork. That is the designed outcome and it is why the lead exists: the lead is the upgrade window, not a grace period after it.
The CLI refuses a version this build does not implement; the chain deliberately does not.
parseGovernanceAction runs during block application, so refusing there would split the network
at the vote — a split no operator can avoid — in place of one at the activation that every
operator avoids by upgrading in time. The check is therefore advisory and lives on the submission
surface. The residual hazard is real and has no guard: a passed vote naming a version nobody
implements halts the chain at the height it names, and there is no action that un-schedules one.
Treat it as the same class of decision as voting a network halt.
Wire-level version negotiation is a separate thing and is still exact-match: BIFROST_VERSION
refuses a peer rather than negotiating, which partitions peering rather than consensus.
A change that is NOT expressible as a rule version is still a flag day, and that is the case
to check for before reaching for the procedure above: the register gates the rules
ConsensusRules names, and a change outside that shape has no height to be given. For one of
those, a kind-B change remains a coordinated restart of the whole network — a published height or
time, every operator agreeing in advance, and docs/RUNBOOK_ROLLBACK.md on standby on every
host. And Ragnarok — the coordinated
chain-wide halt — is BUILT, 2026-09-10 (src/governance/ragnarok.ts, docs/RUNBOOK_RAGNAROK.md, tests/integration/ragnarok.integration.test.ts, 46 tests). If a kind-B rollout goes wrong mid-flight there is
now something that stops the network: strblk node --halt-at H --halt-reason "…" on each host
you can reach, immediately, and a halt-chain vote for the rest. What it does not give you is
a way to start again — lifting a network halt is every operator restarting by hand, and any
who do not, fork (docs/RUNBOOK_RAGNAROK.md §5). A halt is a decision to stop this rollout
permanently, not a pause button.
REASONED: that is a strong argument for not shipping kind-B changes at all until an activation
mechanism exists, and for treating any that must ship as a governance action rather than an
operations one.
5.4 A wire-protocol change is a third thing, and it is milder#
REASONED from src/network/protocol.ts: SLNN_WIRE_VERSION is 1, it is written into every
frame, and a frame carrying another value is rejected with "unsupported wire version". A bump
partitions peering without partitioning consensus — two nodes that cannot handshake still
compute the same chain from the same blocks, so an upgraded node rejoins as soon as its peers
follow. UNMEASURED: no wire bump has been exercised here.
6. A validator key compromised after launch is a hard fork, not an operation#
This is the case most likely to be mistaken for an operations task, and it is not one.
Why. MEASURED by reading src/core/genesis.ts and src/ops/fulla-public.ts: the declared
node set — every seat's address — is inside the genesis hash. Changing a seat's address
therefore changes the genesis, which is kind C, which is a new network.
What the chain can do instead, and what it cannot. REASONED from
src/governance/nidingr.ts and docs/NAMING.md:
- Nidingr takes a seat. A validator caught signing two blocks in one slot is ejected from the assembly's roll by a governance record carried in a block. The evidence is the decision; there is no vote.
- Nothing replaces one. There is no record kind, no governance action and no tool that seats a new address in place of an ejected one. The roster shrinks by one and stays shrunk.
- Fenrir — economic slashing — is BUILT (2026-09-10) and reaches bonded seats only. The
ejection record also burns the offender's bond, which is a ledger lock posted by a
fenrirRecordstransaction after genesis;Einherjar.stakestill has no ledger lock behind it and is not what is burned. A validator that never posted a bond loses standing and nothing else. Ask the node forvalidatorBonds()before assuming otherwise — it reportsunbondedSeatsfor this reason.
So the honest procedure for a compromised validator key is:
- Stop that node. A stopped validator is a missed slot. A validator whose key is in somebody else's hands is an equivocation waiting to be signed.
- Expect Nidingr, do not wait for it. Ejection is automatic on proven
same-slotequivocation and does nothing at all otherwise. A key that is stolen but not yet used to equivocate produces no record. - Escalate to governance immediately, and which instrument depends on whose seat it is.
A seat admitted by vote is removed by vote:
evict-validator, at the thirty-day governance-change timelock, applied throughEinherjarRoll— no new genesis and no restart. A GENESIS seat cannot be evicted;evict-validatorrefuses one deliberately, so the 1,313 cannot be voted off the chain they constitute. For one of those the remedy is dilution —admit-validatorseats honest producers around it — or a hard fork, which is a new genesis and a coordinated restart with every operator agreeing. Ragnarok can stop the chain while you decide (docs/RUNBOOK_RAGNAROK.md); it cannot start it again. - Do not rotate the key locally.
MEASURED: there is no import path intoidentity.json—strblk nodehas no flag that takes a key — so "rotating" a node key means giving that host a new identity, which is a node the genesis has never heard of.REASONEDfromverifyProducerAuthorised: its blocks are refused by every peer with "producer … is not in the authorised validator set". You will have replaced a compromised validator with no validator, and made it look like a deployment problem.
And if more than one node's key is compromised at once: that is a governance escalation for
the operator of the Asgard seats, and the coordinated halt is Ragnarok
(src/governance/ragnarok.ts), not anything on this page.
7. Escalation#
Escalate, do not proceed, when any of these is true:
- the genesis hash moved and somebody wants to roll it as an upgrade;
- the canary reports HOLD, or
[????]on the head and state-root checks together with a node that stopped advancing; - Hlin reports
both builds agree about this chainfailed — two builds disagreeing about one file on disk disagree about what the chain means; - a node does not rejoin after being rolled back;
- anybody proposes a consensus change that is NOT a scheduled rule version, given §5.3, since that one is still a coordinated restart;
- anybody proposes replacing a validator address without a hard fork, given §6;
- anybody proposes rewinding state at or below the depth line, in any circumstance.
Take with you: the canary stdout, the Hlin output, strblk status --dir <datadir>,
curl -s http://127.0.0.1:8081/api/status, and the node's log.
8. What this runbook does not cover#
Each of these is stated where it bites; collected here so a skimming reader cannot mistake the coverage for wider than it is.
- A fleet rollout. §3 U6. No inventory, no agent, no per-host version state.
- An automated rollback trigger. §3 U6. The signal exists; the watcher does not.
Closed 2026-09-23 1 of 4 Next
Closed:
Scheduling a consensus change.CLOSED, 2026-09-23. §5.3. Aschedule-rulesgovernance action appends an activation to chain state with a mandatory 1,325-block lead, so a rule version switches at a voted height with no coordinated window. What remains a flag day is a consensus change that is not expressible as a rule version, and a vote for a version nobody implements still halts the chain at the height it names.Closed 2026-09-10 2 of 4 Next
Closed:
A coordinated halt.CLOSED, 2026-09-10. §5.3 and §6.Ragnarokis BUILT, 2026-09-10 (src/governance/ragnarok.ts,docs/RUNBOOK_RAGNAROK.md,tests/integration/ragnarok.integration.test.ts, 46 tests). An upgrade that goes wrong now has a stop to reach for; it does not have an automated way to start again, andRUNBOOK_RAGNAROK.md§5 explains why that is by construction.Closed, date not recorded 3 of 4 Next
Closed:
Replacing a validator seat.CLOSED, and this entry was stale. §6.MEASURED 2026-09-23by reading the action register: governance carriesadmit-validatorandevict-validator,src/governance/effects.tsapplies both, andtests/integration/validator-roll.integration.test.tscovers the roll changing. Nidingr still only TAKES a seat — that part was never wrong — but the roll stopped being fixed at genesis when Einherjar landed, and a replacement is a vote rather than a new chain. An admission must name a proved STR.domain, which is the check that stopped one compromise converting into an unbounded number of seats.Closed, date not recorded 4 of 4
Closed:
Economic slashing.BUILT 2026-09-10. §6.Fenrir(src/governance/fenrir.ts) burns a bonded validator's stake on the same evidence Nidingr ejects on. What is still true is that the bond is optional: an unbonded seat is ejectable and not slashable, and the coverage is measured rather than assumed.- A wire-version bump. §5.4. Reasoned from source; never exercised.
- A passphrase rotation across an upgrade. If
SOURCELESS_KEY_PASSPHRASEwas set when the identity was written, the same passphrase must be present on restart. Not rehearsed. - Any evidence from CI.
MEASURED, 2026-09-07:ghis unauthenticated here andactis not installed, so no job in.github/workflows/ci.ymlhas ever been observed to run from this machine. Anything in a release plan that depends on CI is configuration, not evidence — and §1.2 shows that the jobs which are configured compare a genesis hash, which a kind-B change does not move.